The optimization of Gebe Airport project using PERT and CPM method

  • Nanang Nahendra Universitas Riau
  • Iwan Nauli Daulay Universitas Riau
  • Anggia Paramitha Universitas Riau
Keywords: Optimization, network planning, critical path, probability

Abstract

Project management implementation require some methods, it is done to control the project performance. The purpose of this study is to determine the form of network planning, critical path and probability level on PT. Ghinan Indo Mandiri, Ternate City. This research doing by quantitative descriptive. The data type used is quantitative data sourced from interview and company's documents. This research uses Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM). Network planning is used to find the critical paths and calculate the probability level. By using the PERT and CPM methods, the initial plan of 34 weeks for the Gebe airport project had a probability level of 97.9%. Furthermore, the crashing program accelerate 2 weeks processing time can be optimized to be 32 weeks while holding 97.9% of probability level with additional costs.

Downloads

Download data is not yet available.

Author Biographies

Nanang Nahendra, Universitas Riau

Department of Management, Faculty of Economics and Business

Iwan Nauli Daulay, Universitas Riau

Department of Management, Faculty of Economics and Business

Anggia Paramitha, Universitas Riau

Department of Management, Faculty of Economics and Business

Published
2022-11-26
How to Cite
Nahendra, N., Daulay, I. N., & Paramitha, A. (2022). The optimization of Gebe Airport project using PERT and CPM method. Operations Management and Information System Studies, 2(4), 208-218. https://doi.org/10.24036/omiss.v2i4.90